AWC project photo showing completed exposed sink drain and water-line connections before wall closure
AWC plumbing project photo showing a repair stage before finish closure. It is not represented as a rental-turnover project or proof of a whole-unit renovation.

Walk the approved location list

Visible completion should be reviewed against the authorized location and finish boundaries. Keep source work, trade completion and appearance acceptance as distinct records.

Close trades and finishes separately

Walk the list, assign punch items and state the disposition of excluded or deferred work. Give each room or repair location its own line with the observed condition, approved work, retained finishes, protection and access requirement. Name who may approve additional work and which owner selections are pending. This lets a manager compare bids and administer the work without relying on an undefined patch, fix or make-ready allowance.

  • Approved scope
  • Recorded changes
  • Completion views
  • Punch disposition
  • Remaining work
  • Document recipient

Document changes and punch work

Do not treat a closed wall as proof of unrelated concealed conditions. When controlled access reveals a different assembly, additional deterioration or unresolved source condition, pause at the agreed checkpoint. Send a privacy-safe finding to the authorized manager and identify the responsible trade or reviewer. The turnover calendar should allow that decision before board, cabinet, trim or paint conceals the area.

Keep excluded work visible

Deliver practical completion photos without resident information or access details. Rental closeout should follow the same room list used for approval. Record completed trade and finish boundaries, approved changes, punch disposition, care or reopening information, exclusions and remaining work. Provide photographs only where appropriate, and remove resident names, mail, access codes, unit identifiers and unrelated belongings from broadly shared records.

Deliver privacy-safe evidence

Define recipient, review timing and ordinary viewing conditions before the final walk. A useful rental option states why its repair boundary fits the verified condition and what would trigger a revision. It assigns fixture or finish purchasing, debris handling, adjacent restoration, resident preparation and return-to-use direction. Actual assemblies and product requirements control the work; a generic turnover checklist cannot establish those field details.

Release the repaired areas

Use the same approved list from intake through punch completion. For a vague, water-related or multi-trade rental list, AWC may recommend the $250 Site Evaluation + Written Bid Package. The fee is credited if the resulting project is approved within 30 days. Send privacy-safe room views, source-work status, access constraints and the owner or manager authorized to approve scope and cost.

The next decision

Closeout should make the repaired result and the remaining responsibilities equally clear.

Continue planning